返回

Fclimb’s Second-Phase Laboratory Under Construction

     时间: 2025-11-13

Fclimb’s Second-Phase Laboratory Under Construction


To further strengthen its R&D and testing capabilities in fall protection technology and lifeline systemsFclimb Safety Technology Co., Ltd. officially launched the construction of its Second-Phase Laboratory in Fengjing Town, Jinshan District, Shanghai, in October 2025.
The project is now progressing steadily, with all engineering work advancing in an orderly manner.

1. Building a Strong Research Foundation for Innovation

As a technology-driven enterprise specializing in height safety protection and lifeline system developmentFclimb has upheld the mission of “Saving Lives at Heights” since its establishment—combining technology and responsibility to safeguard every climb.
Following the successful launch of its first laboratory, Fclimb initiated the second-phase project to further expand its research infrastructure.
The new facility covers approximately 250 square meters and is expected to be fully operational by February 2026.
The upgrade focuses on three key objectives:
  • Enhance testing and verification capabilities to ensure product reliability and safety performance.

  • Build an integrated R&D platform connecting experimental research, performance testing, and data analysis.

  • Promote safety standardization and drive high-quality technological development across the industry.

2. Scientific Planning and Precise Design

The second-phase laboratory is being constructed in strict accordance with ISO laboratory standards, ensuring efficiency, safety, and sustainability from spatial layout to safety systems.
The lab is divided into several specialized zones for streamlined operations: